top of page
urban-deluxe-img3.jpg
transport-img.png

 GO Off-Grid. Keep the Comforts.

Take your Deluxe Tiny Home fully self-sufficient with rainwater harvesting, tanks, hot water, solar and a deck to enjoy it all. Designed in Melbourne. Installed Australia-wide.

From: AU$7,500 +GST — AU$20,000 +GST per module (see pricing below)
Lead time: Typically 3–4 weeks from deposit (subject to schedule)

Module

What it covers

Price (AUD) Roof & Gutters
Roofing upgrade and guttering kit sized for rain harvesting; downpipes and leaf-guard ready.

$7,500 +GST

Rainwater + Waste + Hot Water

Rainwater tank + pump, potable line, holding (grey/black water) tank, and hot water service (electric or gas boosted—site dependent).
$17,500 +GST

Full Off-Grid Solar

Solar array, inverter/charger, batteries, isolators, mounting, and commissioning for typical tiny-home usage.
$20,000 +GST

Entertainer Deck

Treated frame + decking boards, steps and fixings; sized for our 20–40ft footprints.

$12,000 +GST

urban-deluxe-img21.jpg
Our Certifier_edited.png

Why choose off-grid?

Live anywhere – farms, bush blocks, rural retreats, or backyards without services

Prices are for standard installs and typical sizes for our container models. Complex sites, long runs, rock, cranage or custom specs may vary.

Ellipse 2.png
Ellipse 2.png

Lower bills – generate your own power, harvest your own water

Ellipse 2.png

Resale appeal – off-grid ready homes rent and sell faster

Ellipse 2.png

Flexible – choose modules now, add more later

b0c2f481-a151-4226-ad74-3b9ee221b4ad.JPG
Our Certifier_edited_edited_edited.png

Example bundles (popular)

Off-Grid Water Pack – $25,000 +GST Roof & Gutters + Rainwater/Tanks/HWS

We’ll advise you honestly and clearly about what’s required and work to find the simplest path forward.

Ellipse 2.png
Ellipse 2.png

Complete Off-Grid Pack – $45,000 +GST Water Pack + Full Off-Grid Solar

Ellipse 2.png

Retreat Pack – $57,000 +GST Complete Off-Grid + Entertainer Deck

Image-1.jpg
Our Certifier_edited.png

What’s included (at a glance)

Rain harvesting: roof capture to tank, screened inlets, first-flush/leaf protection

Ellipse 2.png
Ellipse 2.png

Pumps & plumbing: pressure pump set, potable line to kitchen/bath, connections to fixtures

Ellipse 2.png

Waste: holding tank with service access (or connect to existing septic where applicable)

Ellipse 2.png

Hot water: compact electric or gas-boosted HWS (model chosen to suit your site)

Ellipse 2.png

Solar: panels, inverter/charger, battery bank, isolators, wiring, testing & commissioning

Ellipse 2.png

​Deck: treated subframe, decking boards, fixings, steps

IMG_0159.jpg
Our Certifier_edited.png

How it works

Site check – quick phone consult + photos/plan to confirm access, fall, services

Ellipse 2.png
Ellipse 2.png

​Quote & schedule – lock in modules, any upgrades, and installation date

Ellipse 2.png

Install day – delivery, set-out, fit-off and commissioning

Ellipse 2.png

Handover – walk-through, maintenance notes, and warranty info

Image-1-1.jpg
Our Certifier_edited.png

Practical details

Service areas: VIC base (Melbourne/Diggers Rest) with installs Australia-wide

Ellipse 2.png
Ellipse 2.png

Lead time: Typically 3–4 weeks from deposit (subject to pipeline & materials)

Ellipse 2.png

​Access: Truck/crane access may be required for modules and tanks

Ellipse 2.png

Power during install: Temporary power may be needed for tool use (we can supply)

Ellipse 2.png

Compliance: We work to manufacturer specs and relevant Australian standards; council/permit needs vary by location—ask us and we’ll guide you

 Frequently Asked Questions

bottom of page